How To Maintain The Fuel Pellet Machine?
Sawdust pellet machine feed inlet can be set up with permanent magnetic cylinder or iron remover, so as not to affect the service life of the pressure roller, mold and central shaft. The temperature of the pellet fuel in the extrusion process is up to 50-85℃, and the pressure roller bears a great passive force in the running process, but lacks the necessary effective dustproof device.
Therefore, the bearings must be cleaned and high temperature resistant grease added every 2-5 working days. The main shaft of the sawdust pellet mill should be cleaned and oiled every one month. The gearbox should be cleaned and maintained every six months. The tightening and replacement of the transmission part screws should be carried out at any time. We must do a good job of equipment maintenance, which is the choice of your long-term use of equipment.


